Rental info

For current availability contact Trustees Theater Events Manager Louis Dickinson at ldickins@scad.edu.

Stage

  • Maple deck with apron extension;
    spring-loaded floor
  • Proscenium opening: 26' h x 35' w
  • Plaster line to rear wall: 20'
  • Apron extension: 11' in front of proscenium
  • Wing space: 12' stage left and stage right (limited)
  • Temporary Marley flooring available

Electrical

  • 1 — LynTec SLC-341-26 motorized breaker system for sound
  • 1 — 600 amp three phase stage disconnect stage right (1 x 100 amp, 1 x 200 amp, 1 x 300 amp)
  • 10 — auxiliary 20 amp, 110 volt outlets

Rigging

14 — Counterweight linesets:

  • 2 — Electric
  • 4 — Scenery
  • 1 — Auxiliary electric
  • 4 — Legs and borders
  • 1 — Rear traveler
  • 1 — Cyclorama
  • 1 — Grand valance
  • Locking rail located stage left
  • 900 lbs. max capacity per scenery line
  • 1500 lbs. max capacity per electric line
  • 50' batten lengths

Sound

  • JBL Vertec Line Array six/side (VT4887A)
  • 2 — JBL VT4880A full-size Arrayable 2x18 subwoofers
  • 1 — Soundcraft Vi3000 FOH console
  • 8 — Meyer MJF212 monitors
  • 5 — iTech IT3500 amplifiers
  • 1 — iTech IT5000 amplifier
  • 1 — iTech IT12000 amplifier

Microphones:

  • 12 — Shure ULXD wireless handheld/countryman/lavalier microphones
  • 6 — Shure SM-81 condenser microphones
  • 6 — Shure SM-58 condenser microphones
  • 1 — Shure Beta 52 microphone
  • 6 — Shure Beta 57 microphones
  • 2 — Crown PCC-160 boundary microphones
  • 12 — Shure SM57LC general use microphones
  • Additional festival inventory available upon request/advance

Video

  • 1 — Sony SRX-R220 4K digital cinema projector
  • 1 — Dolby Digital cinema sound processor CP650
  • 1 — Cinemacannica V-9 35mm motion picture projector
  • 1 — BlackMagic ATEM 4K switcher
  • 4 — Oppo Blu-ray players
  • 1 — Harkness Spectral 240 perforated theater screen (16' h x 35' w)
  • 4 — Sony Blu-Ray players

Intercom

2 Channel Clear Com system

  • In front of house mixing pit
  • On stage
  • Follow spot locations

Dressing rooms

First floor (stage level), from closest to furthest from stage:

  • Production office: Desk, clothing rack, shower, toilet, mirror; one person
  • Star dressing room #1: Table, clothing rack, additional guest seating, shower, toilet, mirror; one or two people
  • Star dressing room #2: Clothing rack, bar stool seating, shower, toilet, mirror; one person, ADA compliant
  • Green room: seating area, greeting area
  • Kitchen: refrigerator, microwave, small ice maker

Second floor, from closest to furthest from stage:

  • Men's dressing room (top of stairs): two sinks, one urinal and two toilets, four showers; 10-15 people
  • Women's dressing room (turn left at top of stairs): two sinks, three toilets, four showers; 30 people

Main house

Main House floor plans

Second floor

Second Floor floor plans

 

Lighting/light plot

  • 192 — 2.4k sensor dimmers
  • ETC Ion Console with Universal Fader Wing and two color monitors
  • 24 — ETC Source 4wrd with standard ETC Source 4 Leko bodies and lenses
  • 8 — Chauvet Ovation C-640FC LED Cyc fixtures
  • 24 — Chauvet COLORado 1-Quad Tour Zoom LED Fixtures
  • 50 — Source 4 Lekos
  • 60 — Source 4 pars
  • 5 — Three-color 1000w Cyc fixtures
  • 5 — Ground Cyc fixtures
  • 2 — 1200w HMI follow spots

View the lighting plot

Loading

  • Loading bay: located at rear of theater
    stage right
  • Loading bay size: 14' h x 9' w

Amenities

  • Laundry
  • Irons and ironing boards
  • Steamers
  • Towels (provided by SMF and the venue)
  • Ice machine
  • Dressing rooms with at least one toilet, shower, clothing rack and mirrors

Soft goods

  • Full complement of stage curtains with appropriate masking
  • Cyclorama: natural